QUALITY
Degree to which the project fulfills the requirements
Company Quality Policy is part of OPA
- WHO SAID WHAT/ WHO GAVE WHICH RULE (Important) :
Joseph Juran : Fitness for use (product does both - what it is supposed to do and does it well)
W Edwards Deming : PDCA (Plan-Do-Check-Act)
Philip Crossby : Zero defects
Do it first time
Quality is "Conformance to Requirement" (product does what it is supposed to do)
Concept of cost of poor quality
Prevention over Inspection
- GOLD PLATING : giving the customer extra
- MARGINAL ANALYSIS : The benefits you are going to get from the improved Quality equals the cost to achieve that Quality. At this point you should stop trying to improve the Quality further. It will be of no use . makes sense :)
- KAIZEN : Continuous Improvement. It's a philosophy that guides management rather then a particular way of doing Quality Assurance.
- JIT (Just In Time) : No/ Zero inventory, Force attention on Quality. If anything goes wrong there is not any extra inventory to deal with the mistake.
- IMPACTS OF POOR QUALITY :
- Increased cost
- Decreased profit
- Low morale
- Low customer satisfaction
- Increased risk
- Rework
- Schedule delay
- QUALITY MAIN BENEFITS :
- Less rework
- Higher productivity
- Higher efficiency
- More satisfaction
- PLAN QUALITY : What is quality. How to ensure it.
- PERFORM QUALITY ASSURANCE : Are we following the processes and procedures as we planned. Preventive measure. Tracking the way you work and improving it all the time.
- CONTROL QUALITY : Examine the actual deliverable and ensure it is correct, Corrective measure. Inspecting product to find defects.
You should be absolutely clear about the difference between PERFORM QUALITY ASSURANCE and CONTROL QUALITY . Tools used in the above two processes are the same but in QUALITY ASSURANCE they are used to check the processes and in CONTROL it checks the product. Just because you see a perform quality control tool does not mean you are in control Quality process, the same are used in Quality assurance too. Figure out what you are using them for
- COST OF QUALITY : How much will be spent on the Quality. Absolutely everything you spent to ensure the quality on the project. Cost of all (Prevention + Inspection) activities. e.g. testing, time spent in writing standards, reviewing documents, meeting to analyze the root cause of the defect, rework to fix the defect etc.
Cost of Conformance : money spent to avoid the problems .
Cost of non-conformance : Money spent because of the problem that occurred .
- SEVEN BASIC QUALITY TOOLS :
- Cause and effect diagram (Fishbone or ISHIKAWA) : See all of the possible causes (material, worker, machine). Pinpoint the cause. Vertical line of fish bone shows category and horizontal line of fishbone shows root cause.
- Flow chart : How processes work visually.
- Check sheet : Used to verify that a set of required steps have been performed.
- Pareto diagram : (80-20), 80% of the problems are because of 20% of causes. Large number of problems are caused by a small number of causes and that category is the most important.
- Histogram : How your data breaks down into categories.
- Control chart : Rule of seven. Upper control limit, lower control limit and the mean. Any point outside an upper or lower control limit - that data point is out of control - entire process is out of control. Seven data point on one side of the mean - process out of control.
- Scatter diagram : Relate two different types of data to each other.
- IDENTIFY: The question is talking about which Quality Tool
Cause and Effect : A creative way to look at the cause of a problem OR Identify the best way to plan OR help stimulates thinking, organize thoughts, generate discussion OR explore the factors
Pareto : Help focus attention on the most critical issue OR Prioritize potential cause of the problem OR Separate the critical few from the uncritical many.
- DOE (Design Of Experiment) : Statistical method Fast and Accurate. Identifies which variable will have the most influence on a quality outcome.
- SIGMA (Standard Deviation ) : How much variance from the mean is permissible in a process.
- PROCESS ANALYSIS : If you are doing something again and again, check it after few. Like installation of computers
- AUDIT : To check if the customer is following the quality process. Auditor comes from outside the company.
- FIXING THE BUG :
In project : Solve the problem that gives trouble
In process : Avoid your project's Problems + other projects can learn from the problems you have faced
- BENCHMARKING : It can give you some reference points for judging your own project. Part of OPA.
FEW IMPORTANT COMPARISONS
QUALITY
|
GRADE
|
Degree
to which the project fulfills the
requirements like ISO9000. What you have asked for that function.
You
asked for a chicken pizza and you got noodles that is a quality
problem
Always a problem
|
Same
functional use but different technical characteristic
You
asked for a chicken pizza but you got a mushroom pizza
that is a grade problem
May not be a problem
|
PRECISION
|
ACCURACY
|
Precision
is a measure of EXACTNESS
e.g. All
bullets at one place even if away from bulls eye that is HIGH
PRECISION
|
Accuracy
is an assessment of CORRECTNESS. measured value
close to the true value
e.g. Bullets
more spread out but equidistant from the bulls eye is same degree
of ACCURACY
|
ATTRIBUTE SAMPLING
|
VARIABLE SAMPLING
|
Result
either conform or does not conform. Yes or no
|
Result
is rated on a continuous scale that measures the
degree of conformity
|
PREVENTION
|
INSPECTION
|
Keeping
errors out of the process
|
Keeping
errors out of the hands of the customer
|
TOLERANCE
|
CONTROL
LIMIT
|
Specified
range of acceptable results. Beyond this it will be unacceptable
|
Boundaries
of common variation in a statistically stable process.
e.g. upper
control limit, lower control limit
|
VALIDATED
CHANGES
|
VERIFIED
DELIVERABLES
|
The
changed/ repaired item is inspected
|
The
correctness of the deliverable is checked
|
QUALITY
MATRIX
|
QUALITY
CHECKLIST
|
How
the control quality process will measure a project or product
attribute
e.g. On time performance, cost control, defect frequency, failure rate,
test coverage
|
Component
specific
Used
to verify that a set of required steps have been performed
|